Open Collective
Open Collective
Loading
Metal and Concrete moved
Published on May 24, 2023 by Heinz Robert

At the last Work is Play weekend from 18-21 of May we have cut a lot of metal and demolished a lot of concrete to make more space. We borrowed a 30kg demolition hammer which was running almost 7-8 hours per day, operated by some strong people who even have dreamt of shattering concrete.
All the fence got cut and we moved about 7 tones of iron outside.
This weekend was very satisfying and productive. Thanks to everybody who helped with physical labor and mental support.